Turchi 300F hydraulic pile driver. Reduce pile-laying time by up to 30 percent
The tracked pile driver for photovoltaic plants of 3 MW and up, guardrails, and fencing. A single operator, ready to work immediately. Production limited to approximately 20 machines per month: those who order now will receive it in about 3 months.
Why choose a Turks pile driver
High infusion power
Hammer up to 1,500 joules. Fewer blows and faster installation.
Maximum maneuverability
Rubber tracks and gyros. Work in tight spaces without additional cranes.
Absolute precision
Column with adjustable front and side tilts, optional verticality systems. Precise mounting even on sloping terrain.
Reliability made in Italy
Italian construction, quality components and CE certification. Less downtime and reduced maintenance costs.
Ideal for photovoltaic installers, construction and road contractors, companies that install safety barriers or structures on poles.
The 300F is the pile-driving machine designed for photovoltaic fields of 3 MW and up: 350-450 poles per MW, installed in about 3 days. For 1-2 MW plants, there is the 260F: in the quote, we will indicate the model best suited for your construction site.
Main specifications of 300F
The 300F model weighs 4.5 tons and is compact. It is equipped with a 950, 1,200, or 1,500 Joule hammer, a 180-bar hydraulic system, and can install piles up to 6 meters. The mast tilts ±10° laterally to keep the pile vertical even on sloping ground. The 300F is not the cheapest pile driver on the market: it is the one with the lowest cost per driven pile, with more piles per day and a single operator. In the quote, you will find the price and configuration for your job site, and list prices are on the pricing page.
Accessories and customizations
Mechanical extractor, hydraulic core drill, D.T.H. pneumatic hammer, automatic verticality, and GPS: the 300F is configured based on the site, even with steel tracks with rubber pads. Ask for the configuration suitable for your job in the quote.
4,000 poles installed in 23 days with a single operator: the Turchi 300F at work on the 6 MW plant in Voghera
"With the Turchi 300F we installed 4,000 poles in 23 days, with just one operator."
Giovanni Corrado, 6 MW photovoltaic plant in Voghera (Pavia)
Receive your quote in 12 hours
Fill out the form: detailed quote within 12 working hours, no obligation. DAMAC is the official Turchi dealer for Italy. Want to see the machine in person? Mention it in the message and we will organize a visit to our headquarters.
FAQ
What is the maximum height of installable poles?
The Turchi 300F can install poles up to 4,400 mm, 5,200 mm or 6,000 mm depending on the column extension used (including 4400/5200 mm, 6000 mm optional).
Can the pile driver work on a slope?
Yes, within the limits of the user manual: up to a 10° (18%) slope with the machine correctly oriented to the incline, and up to 15° (27%) only with piles up to 4.4 m. With 6 m piles, the machine works on flat ground. The mast tilts ±10° laterally to keep the pile vertical.
Can it be used for photovoltaic poles and road barriers?
Yes. The 300F is designed for driving in and screwing in photovoltaic poles, guardrails, fences and agricultural applications.
How many operators are needed to use it?
The 300F is a self-propelled machine designed to be used by a single operator because of its centralized controls and precise hydraulic system.
What is the power of the hammer?
It is available with a 950, 1,200, or 1,500 Joule hammer. Adjustable frequency of 620–1,500 blows/min with the 950 J and 570–1,180 blows/min with the 1,200 J.
What speed does the car reach?
The travel speed is 1.92 to 3.33 km/h, which is sufficient for fast site movement even on large PV systems.
What is the weight of the machine?
Operating weight is 4,500 kg, with a low center of gravity for maximum stability even in difficult terrain.
What kind of plumbing system do you use?
Open-loop proportional system with beat frequency adjustment, gear pump and 140-liter tank.
Does it need special maintenance?
Apart from normal engine maintenance and periodic check of the hydraulic system, it does not require complex operations. The components are designed for intensive daily use.
Do you provide service and spare parts?
What is the delivery time?
Machines are built to order: delivery times will be specified in the quote. Transport to the job site can be organized upon request.
Do you want to reduce installation time and increase productivity?
Detailed quote within 12 hours, no obligation.