Equipping your future

Info and availability: +39 064 592 0494

Are you considering an Orteco pile driver? First put the numbers side by side

Turchi 300F vs Orteco HD range: weight, pole height, hammer and real site costs. Data-driven comparison, no commitment — and detailed quote in 12 working hours.

DAMAC is an independent dealer: if the right machine for your job is not a Turchi, we'll tell you.

Turchi vs Orteco: compare pile drivers before deciding

Why those who compare then choose Turchi

Half a ton lighter

300F: 4.5 t versus approximately 5 t of the Orteco HD Pro. Easier transport, lower handling costs between sites.

Poles up to 6 meters

The 300F installs poles up to 6 m (HD Pro 5m: up to 5 m declared). Extra margin for photovoltaic and high guardrails.

Any pole profile

C, U, IPE, tubular and special profiles: custom dies made to order for your pole.

Quote in 12 hours

Configuration and price for your site within 12 working hours. No other manufacturer promises this.

Turchi 300F vs Orteco HD Pro: the numbers, side by side

Data declared by manufacturers. Then there are the numbers that matter most: those of your site — and we calculate them in the quote.

Turchi 300FOrteco gamma HD
La macchina
Peso totale4,5 t — più leggera da trasportareHD Pro 5m: 5.025–5.035 kg
Altezza palifino a 6 mfino a 5 m (HD Pro 5m)
Martello fino a 1.500 Joule, configurabile sul tuo lavoro1.200/1.500 Joule
Colonnainclinazioni frontali fino a −51°, laterali ±9,5°inclinazioni non dichiarate in scheda
Profili di paloqualsiasi profilo, senza limiti di sezione: matrici custom su richiestasezione max dichiarata 210×210 mm
Il servizio
Preventivo dettagliatoin 12 ore lavorative, per iscrittosu contatto commerciale, tempi non dichiarati
Assistenza tecnicadiretta, anche via WhatsAppsupporto post-vendita via sede e portale service
Ricambiqualsiasi ricambio spedito in 24/48hricambi originali da portale, tempi non dichiarati
Prova della macchinain sede, prima di decideredemo non pubblicizzata
Permuta del tuo usatosì, con valutazionenon pubblicizzata
Iperammortamento / Industria 4.0ti supportiamo noi nella praticakit GPS/automazione disponibili; supporto pratica non indicato

Su peso, altezza pali, profili senza limiti e tutto il capitolo servizio, la 300F parte in vantaggio — e ogni voce della colonna verde te la mettiamo per iscritto nel preventivo.

Fonti: schede tecniche e materiali ufficiali Orteco (orteco.com, schede DirectIndustry gamma HD — verifica luglio 2026). Dove un dato non è dichiarato pubblicamente lo scriviamo com’è: confrontare prima di firmare conviene sempre.

Main specifications of 300F

The 300F model weighs 4.5 tons and is compact. It is equipped with a hammer up to 1,500 Joules, 180-bar hydraulics and can install poles up to 6 meters. The column is adjustable with front tilts down to -51° and side tilts ±9.5° to ensure accuracy even on slopes.

Compact: Only 4.5 Ton
Hammer up to 1,500 Joules
180 bar hydraulic system
Adjustable column
Front view of Turchi 300F pile driver with inclined column

Accessories and customizations

Equipped with accessories such as a mechanical extractor, hydraulic core drill, D.T.H. pneumatic hammer, automatic verticality system and GPS, the pile driver offers maximum precision, time savings and optimal performance even in heavy-duty use thanks to the possible configuration with steel tracks and rubber pads.

Mechanical extractor
Hydraulic core cutter
Pneumatic hammer D.T.H.
Automatic verticality
GPS
950J hydraulic hammer mounted on Turchi 300F
Orteco is a good manufacturer. We're telling you.

On the market since 1980, wide range, solid machines. If you've put it on your list, you did well.

That's exactly why the comparison works in our favor: put a Turchi next to the Orteco you're considering, look at weight, pole height and productivity for your type of work, and decide with the numbers. And if another machine would be better for your site, we'll tell you first: we live on satisfied customers, not wrong sales.

Turkish 300f pile driver in damac yard

Turkish pile drivers in action: real results on site

Turks 300f at work with operator at a photovoltaic construction site
Turkish pile drivers at a guardrail construction site
Pile driver at work in agricultural field for pile driving

How it works: from the quote to the construction site

1. Fill out the form

Two minutes: tell us the type of work and type of piles. No obligation.

2. Quote in 12 hours

Receive a detailed quote within 12 working hours, with the right configuration for your site.

3. Try it in person

If you like, come to our headquarters: see the machine at work before deciding.

4. On site

Production limited to approximately 30 machines per month: those who order now receive the machine in approximately 3 months.

Turchi vs Orteco: compare pile drivers before deciding

Receive your quote in 12 hours

Fill out the form: we'll respond with a detailed quote within 12 working hours, no commitment. Want a direct comparison with the Orteco model you're considering? Write it in the message.

FAQ

Can I compare a Turchi with the Orteco I'm considering?

Of course. Tell us the model (e.g. HD Pro 1200 or 1500, SMART, HD) and the type of work: we'll prepare a technical and productivity comparison for your case, included in the 12-hour quote. And if you want, come to our location to see the Turchi working before deciding.

Yes. The column can tilt from +10° to -51° frontally and from +9.5° to -9.5° laterally, allowing precise installations even on uneven terrain or with steep slopes.

Yes. The 300F is designed for driving in and screwing in photovoltaic poles, guardrails, fences and agricultural applications.

The 300F is a self-propelled machine designed to be used by a single operator because of its centralized controls and precise hydraulic system.

The 300F is equipped with hammers from 950 up to 1,500 Joules, with adjustable frequency based on the type of pole and terrain. In the quote, we will indicate the right configuration for your job.

The travel speed is 1.92 to 3.33 km/h, which is sufficient for fast site movement even on large PV systems.

Operating weight is 4,500 kg, with a low center of gravity for maximum stability even in difficult terrain.

Open-loop proportional system with beat frequency adjustment, gear pump and 140-liter tank.

Apart from normal engine maintenance and periodic check of the hydraulic system, it does not require complex operations. The components are designed for intensive daily use.

Variable according to availability. Typically 14 to 45 days, with specialized transportation included upon request.

Because we are independent: DAMAC sells and rents earthmoving machinery from multiple brands and only profits if the customer remains satisfied over the years, through parts and service. Recommending the wrong machine would cost us much more than the sale. That's why the comparison also includes the points where Orteco is strong.

Before signing, look at your site numbers

A 1 MW plant requires approximately 350–450 poles: with the right configuration a Turchi 300F completes it in approximately 3 days (estimate by standard criteria). Detailed quote in 12 hours, no commitment.

Production limited to approximately 30 machines per month: those who order now have the machine in approximately 3 months.

Turchi vs Orteco: compare pile drivers before deciding
Fast delivery throughout Europe

Shipping with specialised carriers.

After-sales service

Technical and commercial support before and after purchase.

Machines tested and ready

All equipment is checked before sale.

Secure and traceable payments

Bank transfer, PayPal or other secure methods.

Request a consultation

We reply the same day, no obligation.

100+ machines 50+ accessories Italy and Europe
[gravityform id="2" title="true" ajax="true" field_values="product-title=' . urlencode($product_title) . '"]
Le nostre sedi: Abruzzo · Catania · Emilia-Romagna · Europa · Foggia · Italia · Lazio · Livorno · Parma · Pescara · Puglia · Roma · Sardegna · Sicilia · Toscana