Used Turchi pile driver: tested, guaranteed, and job-site ready
Available now in the yard: a used 2024 Turchi 300F, workshop-inspected, plus new machines ready. Clear pricing and quote in 12 hours.
In the yard now: used and ready for delivery
Real, updated inventory. Price on request: we'll tell you in 12 hours, no runarounds.
-
84.000,00 €Original price was: 84.000,00 €.82.000,00 €Current price is: 82.000,00 €. VAT excl.LocationParmaYear2026Certificazione CE✓ Yes -
Price on requestLocationAnguillara SabaziaYear2025Certificazione CE✓ Yes
-
Price on requestLocationRomeYear2024Certificazione CE✓ Yes
-
Price on requestLocationRomeYear2025Certificazione CE✓ Yes
Why choose a Turchi pile driver
Workshop testing
Every used pile driver is inspected and serviced by our workshop before delivery.
CE, manuals, and documents
Machines with CE certification, operation and maintenance manual, and documentation in order.
Immediate availability
The used stock is in the yard: no waiting for production. You see it, you test it, and you take it to the job site.
Trade-in your used equipment
Have a machine to trade in? We will evaluate it in the quote and collect it upon delivery.
Used hydraulic pile driver: when it's worth it and when it's not.
Used Turchi machines are rare: they last, and those who have them keep them. In the yard now, there is a refurbished 2024 300F. If it's not the right size for your site, we can offer you a new one, delivered in about 3 months, or a zero-km machine already available. In the quote, we compare the two paths, price in hand.
Main specifications of 300F
The used 300F in the yard is from 2024, with a 950 Joule hammer, GPS, and mechanical extractor. A used hydraulic pile driver like this leaves our workshop inspected and ready to work. In the quote, you receive the price, hours, and actual condition of the machine, with photos and videos.
Accessories and customizations
Mechanical extractor, hydraulic core drill, D.T.H. pneumatic hammer, automatic verticality, and GPS: the 300F is configured based on the site, even with steel tracks with rubber pads. Ask for the configuration suitable for your job in the quote.
4,000 poles installed in 23 days with a single operator: the Turchi 300F at work on the 6 MW plant in Voghera
"With the Turchi 300F we installed 4,000 poles in 23 days, with just one operator."
Giovanni Corrado, 6 MW photovoltaic plant in Voghera (Pavia)
Receive your quote in 12 hours
Fill out the form: we will tell you the price, year, and condition of the available used equipment, with photos and videos. Have a machine to trade in? Mention it in the message. Response within 12 business hours.
FAQ
What is the maximum height of installable poles?
The Turchi 300F can install poles up to 4,400 mm, 5,200 mm or 6,000 mm depending on the column extension used (including 4400/5200 mm, 6000 mm optional).
Can the pile driver work on a slope?
Yes. The column can tilt from +10° to -51° frontally and from +9.5° to -9.5° laterally, allowing precise installations even on uneven terrain or with steep slopes.
Can it be used for photovoltaic poles and road barriers?
Yes. The 300F is designed for driving in and screwing in photovoltaic poles, guardrails, fences and agricultural applications.
How many operators are needed to use it?
The 300F is a self-propelled machine designed to be used by a single operator because of its centralized controls and precise hydraulic system.
What is the power of the hammer?
It is available with a 950 or 1200 Joule hammer, with adjustable frequency 620–1500 blows/min (950J) or 570–1180 blows/min (1200J).
What speed does the car reach?
The travel speed is 1.92 to 3.33 km/h, which is sufficient for fast site movement even on large PV systems.
What is the weight of the machine?
Operating weight is 4,500 kg, with a low center of gravity for maximum stability even in difficult terrain.
What kind of plumbing system do you use?
Open-loop proportional system with beat frequency adjustment, gear pump and 140-liter tank.
Does it need special maintenance?
Apart from normal engine maintenance and periodic check of the hydraulic system, it does not require complex operations. The components are designed for intensive daily use.
Do you provide service and spare parts?
What is the delivery time?
Variable according to availability. Typically 14 to 45 days, with specialized transportation included upon request.
Want a pile driver immediately, without waiting for production?
There is only one used unit available. Detailed quote in 12 hours, no obligation.
